• The construction of the track begins on May 16th, to be completed by July 20th.

    Project Architect: Mark Wrona of URS, Grand Rapids

    General Contractor: Parrish Excavating, Quincy, MI

    Cost: $637,456.00

    Project Highlights

    1. New sub base, asphalt, running surface (polyurethane)
    2. New high jump area
    3. New long jump and pole vault area
    4. Many drainage issues addressed, both around track and football field
    5. New walkways to home and visitors bleachers, and concession stand
    6. New concrete plaza around concession area
    7. New irrigation system for football field
    8. Erosion and weed control under bleachers
    9. New 4’ fence around perimeter of track
     
     